This is the area immediately below the soil that is to be stabilised. It is important that the sub- base is structurally sound as this could affect the strength of the stabilised layer. The most effective way is to rip the layer to be stabilised and move the loose soil to the side or ends to expose the sub-base. Re-compact or improve the sub-base before stabilising the base layer.
Posted in: English